I. Attenuation of draw sliver to a suitable size for spinning.
II. To insert a small amount of twist to strengthen the roving.
III. To wind the twisted strand roving into a bobbin.
Operation involved in speed frame:
I. Drafting
II. Twisting
III. Laying out
IV. Winding
V. Building motion