Machine Efficiency E = (R * 100)/R+S
R = Uninterrupted running Time for 1000 meters (sec) = (1000 * 60)/Machine speed in mtr/min
S = total of time, in seconds for which the machine is stopped for a production of 1000 meters.
= R + (B * N * T1)/400+ T2/L + T3/(L*C )+ T4
B = End breaks / 400 ends / 1000 meters N = Number of ends.
L = Set Length in 1000 meters C = Beams per creel.
Timing of activities in Seconds are
T1 = To mend a break T2 = To change a beam
T3 = To change a Creel T4 = Miscellaneous Time loss / 1000 mtrs.
Production in meters. per 8 hrs.(K) = 480 x mtrs / min x E / 100 Kgs.
Production in Kgs. Per 8 hrs. = (K x N) / (1693 x English Count)
Warping Tension = 0.03 to 0.05 x Single Thread Strength