Sportech
Lowering off needs the rope to reach the anchor and come back down. A 60 metre rope is not enough for a 30 metre route.
— m
Twice the height plus setback, plus the knot and belay, plus the margin
Lowering a climber from the anchor and abseiling on a doubled rope both use the route twice: up to the anchor and back down to the ground. Height, setback, allowance and margin are yours; guidebook heights are often rounded and lines wander, which is what the margin is for. The single-strand figure is for a line fixed at the anchor and hanging to the ground. Stretch under load is not added separately. **Always tie a stopper knot in the free end of the rope, or close the system, whatever this tool says: a rope that is too short drops the climber off its end.**
Climbing Rope Length for a Route: Lowering or Abseil, Safety Margin, Longest Route & Rope Mass — free, with the formula and a worked example, at Textile School.