Industrial Engineering

Cut-to-Box Lead Time & Stage WIP Velocity Calculator

Total WIP says how slow the floor is. The split says where to go and stand.

Work in Progress By stage
pcs
pcs
pcs
pcs
Flow Throughput
pcs/day
h

Cut-to-Box Lead Time

— days

From cut panel to packed garment

Stage Dwell

Cutting Dwell
— days
Sewing Dwell
— days
Finishing Dwell
— days
Packing Dwell
— days
Largest Stage Share of WIP
— %
Lead Time
— h

Little's Law needs a system in steady state, so a count taken while a large order is being launched or run out will mislead — take WIP at the same point in the week, repeatedly, before drawing conclusions. Throughput must also be measured at the exit, since counting output at sewing while WIP accumulates in finishing produces a lead time shorter than reality. The largest stage holds the most inventory but is not automatically the constraint: a stage can hold WIP because it is slow, or because the stage after it is, and only watching whether the queue grows or shrinks distinguishes the two.

Cut-to-Box Lead Time & Stage WIP Velocity Calculator — free, with the formula and a worked example, at Textile School.