The drawing gives the rise and the gradient. The blanket covers the hypotenuse, plus the bit buried at the top.

Slope From the drawing
m
H : 1V

2 for a 1V:2H slope. The same figure written 2:1 (H:V) on many drawings.

m

Measured along the toe or the crest, across the direction the rolls run.

cm

Blanket buried in the anchor trench at the crest and carried past the toe, added to every strip.

Blanket & Fixing From the product sheet and the specification
m
m
cm
cm
per m²

From the manufacturer's staple pattern for this slope, laps included.

%

A planning figure, not a measured loss.

Rolls to Order

— rolls

The larger of the count by length (with allowance) and the count by whole cuts

Layout

True Slope Length
— m
Slope Angle
— °
Strip Length incl. Anchor
— m
Strips across the Slope
— strips
End Joins per Strip
— joins
Linear Metres Laid
— m
Rolls by Length incl. Allowance
— rolls
Rolls if Each Strip Is Cut Whole
— rolls
Slope Area
— m²
Blanket Area Laid
— m²
Laps & Anchor above the Slope Area
— %
Staples or Pins
— staples

The tool lays every strip down the slope from the crest, so the true slope length, not the plan distance, sets the strip. Laps, the crest anchor and the staple pattern are the product sheet's and the specification's; the tool has no figure of its own and does not choose a blanket for the slope or the flow. When a strip is shorter than a roll, whole strips are cut from each roll and the offcut is counted as lost; when it is longer, strips are joined down the slope at the end lap. The order is the larger of the two roll counts. **This is a quantity take-off for a plane slope, not an erosion design.**