Apparel Manufacturing
A line runs at the speed of its bottleneck, never at its average.
— min
Average work content per operator station
Balance efficiency below about 80% means work content is badly distributed. Split the bottleneck before adding operators anywhere else.
Operator Line Balancing & Pitch Time Calculator — free, with the formula and a worked example, at Textile School.