Production Planning

JIT Yarn Feed Rate vs Loom Weft Depletion Calculator

A slightly negative balance drains the buffer invisibly for a fortnight, then stops the shed all at once.

Weaving Shed Consumption
no.
picks/min
m
Ne
%
%
Supply Spinning mill
kg/day
kg
days

Shed Weft Demand

— kg/day

Yarn the weaving shed consumes per day

Supply Balance

Consumption per Loom
— kg/day
Packages per Day
— no.
Supply Balance
— kg/day
Buffer Stock Required
— kg
Package Change Interval
— h

A single average count and one efficiency figure stand in for the whole shed, which is fine for a sizing exercise and wrong for a schedule — styles differ in count, width and pick density, and the mix is what actually determines demand. Efficiency is also not constant across the week, so a balance that works on average can still starve looms during a good run. The buffer figure assumes yarn is fungible between looms; where styles need specific counts or lots, cover must be held per lot and the total is considerably larger.

JIT Yarn Feed Rate vs Loom Weft Depletion Calculator — free, with the formula and a worked example, at Textile School.