A quotation below your cost per piece is not a saving. Most of that cost does not leave with the work, and the part that stays is spread over everything else you make.

The Quotation

What the outside price really is once the work has travelled

The subcontractor's rate as quoted

Out and back, plus the handling at each end

The rejection the extra handling and loss of direct control add

The Decision

Volume, and whether the capacity freed is worth anything

The volume the decision covers

Contribution the freed capacity earns on other work. Zero unless the line was genuinely full

What It Costs In-House, and What Would Actually Leave

The second column is the whole tool and it is a management question rather than an accounting one. Chemicals leave entirely. Depreciation on a machine already bought leaves not at all. Labour leaves to the extent that people are genuinely released or redeployed onto work that earns, rather than kept and found something to do. Answer it honestly and the sheet is useful; answer it optimistically and it will agree with you.

Cost LineIn-House Cost cost/pcActually Leaves %Avoidable cost/pcStranded cost/pcShare of Stranded Cost %Row actions
———
———
———
———
———
———

Add line opens a form. Cells in the sheet stay directly editable.

How to read this sheet

The avoidable share of each line is a management fact and not an accounting one, and it is the only input that matters. Depreciation on a machine already bought is nil whatever the ledger says, because selling the machine is a separate decision with its own sheet; if it genuinely would be sold, enter the loss of its resale value as a line of its own rather than inflating this column. Labour is avoidable only to the extent that people are released or redeployed onto work that earns - keeping them and finding them something to do is not a saving, and entering it as one is how this sheet is made to agree with a decision already taken. Capacity released is credited only where the line was genuinely full and the freed hours will carry other work; it defaults to zero because most of the time neither is true, and crediting it otherwise is the mirror image of the absorbed-cost error. Rejection is applied to the outside price because work that comes back wrong has already been paid for, and the break-even price is the inverse of the whole calculation - the number to take into the negotiation instead of your own cost per piece. Nothing here prices the things that decide subcontracting as often as money does: control of quality, protection of a process nobody else should learn, lead time, and what happens to this arrangement when the subcontractor is full and you are not their largest customer.

Textile SchoolMake or Buy: Subcontract Decision Sheetwww.textileschool.com

Make or Buy: Subcontract Decision Sheet — free while in preview, with every line item and the download, at Textile School.