Home » Calculators » Weaving & Fabric Formation » Narrow Fabrics, Tapes & 3D Weaving » Needle Loom Production Calculator (Tapes & Webbing)
Jump to a calculator 671 tools

Narrow Fabrics

Needle Loom Production Calculator (Tapes & Webbing)

Put this calculator on your own site

Paste this where you want the calculator to appear. It works on any site — WordPress, Squarespace, Webflow, Ghost or plain HTML — and needs no JavaScript of yours. It carries a link back here, which is the only thing we ask for it.

See what it looks like

Needle looms are sold on picks per minute but paid for in metres of tape. The pick density between them decides which number matters.

Loom Running
picks/min
picks/cm
no.
%
h
Tape Finished
g/m

Loom Output

— m/shift

All tapes together at the stated efficiency

Output Breakdown

Tape Speed
— m/min
Metres per Tape
— m/shift
Woven Mass
— kg/shift
Picks Inserted
— no./shift

Needle looms lose more time to warp change and pattern set-up than to stops, so take the efficiency figure from a full order cycle rather than from a steady run.

Using this calculator

About the Needle Loom Production Calculator (Tapes & Webbing)

The formula

This is the expression the tool evaluates. Every term is named underneath, with the unit it must be supplied in.

Woven tape speed, m/min
tapeSpeed = pickRate / (picksPerCm x 100)

Each pick advances the tape by 1 / picks-per-cm centimetres.

Metres of tape per shift, all tapes together
loomOutput = tapeSpeed x 60 x shiftHours x efficiency / 100 x tapes

Every tape on the loom grows at the same speed off the same drive.

Woven mass per shift, kg
massOutput = loomOutput x tapeWeight / 1000
Symbols used above
SymbolStands forUnit
pickRatePick Ratepicks/min
picksPerCmPick Densitypicks/cm
tapesTapes Woven in Parallelno.
efficiencyEfficiency%
shiftHoursShift Lengthh
tapeWeightTape Weightg/m
loomOutputLoom Outputm/shift
tapeSpeedTape Speedm/min
metresPerTapeMetres per Tapem/shift
massOutputWoven Masskg/shift
picksInsertedPicks Insertedno./shift

How the result is derived

Step by step, from the values you type to the figure on screen.

  1. The 6 inputs are read from the form on every keystroke: Pick Rate, Pick Density, Tapes Woven in Parallel, Efficiency, Shift Length and Tape Weight.
  2. Each value is checked against the accepted range in the input table below. A value outside its range stops the calculation rather than producing a misleading figure — the results blank out and a message appears.
  3. The validated values are substituted into the expression above, which resolves Loom Output together with every supporting figure in one pass — no value is carried over from a previous entry.
  4. The supporting outputs — Tape Speed, Metres per Tape, Woven Mass and Picks Inserted — come from the same pass, so they always describe the same case as the headline figure.
  5. Results are rounded for display only. The full-precision value is used throughout the chain, so reading a rounded intermediate figure back into the tool by hand can shift the last digit.

What each input means

Where to read each value on the floor, the unit it must be in, and the range the tool accepts.

InputUnitAccepted rangeDefaultWhat it means
Pick Ratepicks/min100 to 3000 picks/min1500
Pick Densitypicks/cm1 to 100 picks/cm12
Tapes Woven in Parallelno.1 to 100 no.8
Efficiency%20 to 100 %88
Shift Lengthh1 to 24 h8
Tape Weightg/m0.1 to 500 g/m4.5

What the tool returns

The headline figure and every supporting value it is built from.

OutputUnitWhat it tells you
Loom Output (headline result)m/shiftAll tapes together at the stated efficiency
Tape Speedm/min
Metres per Tapem/shift
Woven Masskg/shift
Picks Insertedno./shift

Worked example

Given

Pick rate
1,500 picks/min
Pick density
12 picks/cm
Tapes
8, at 4.5 g/m
Shift
8 h at 88%

Substituting

tapeSpeed = 1,500 / (12 x 100) = 1.25 m/minrunning minutes = 60 x 8 x 0.88 = 422.4per tape = 1.25 x 422.4 = 528 m; loom = 528 x 8 = 4,224 mmass = 4,224 x 4.5 / 1000 = 19.0 kg

Answer

Tape speed
1.25 m/min
Per tape
528 m
Loom
4,224 m, 19.0 kg

Doubling the pick density to 24/cm for a firmer tape halves every output figure at the same pick rate.

How to use it

  1. Work through the input groups in order — Loom and Tape. The defaults are a realistic case, so you can change one value at a time and watch what moves.
  2. There is no calculate button. Every figure recalculates as you type or drag, which is what makes this usable for a what-if sweep rather than a single answer.
  3. Read Loom Output in the dark results panel — that is the headline figure, expressed in m/shift.
  4. Check the supporting rows underneath (Tape Speed, Metres per Tape, Woven Mass and Picks Inserted) before acting on the headline — they are where an implausible input usually shows itself first.
  5. Reset to defaults returns every field to the reference case, which is the quickest way to check whether a surprising result came from the tool or from an input you had changed earlier.

Where this is used

  • Process planning — establishing Loom Output before a trial is booked, so machine time and material in Narrow Fabrics, Tapes & 3D Weaving are committed against a calculated figure rather than an estimate.
  • Costing and quotation — Loom Output is an input to the cost sheet, and quoting from a worked number rather than a remembered one is what keeps a margin intact.
  • Troubleshooting — when the floor result drifts from plan, entering the measured values (starting with Pick Rate) shows how much of the gap in Loom Output each variable explains.
  • Teaching and study — the accepted ranges bracket normal Narrow Fabrics, Tapes & 3D Weaving practice, so moving one variable at a time shows the shape of the relationship rather than a single answer.

Reading the result

Typical bands and what each one is telling you.

ValueWhat it indicates
Output short of planCheck efficiency over a full order, including warp changes and set-up, not just a steady run.
Need more metresMore tapes per loom raises output in proportion; a higher pick rate does the same until warp breaks rise.
Pricing by weightUse the woven mass per shift with the tape weight from a weighed sample, since pick density and take-up both change it.

Assumptions and limits

  • Needle looms lose more time to warp change and pattern set-up than to stops, so take the efficiency figure from a full order cycle rather than from a steady run.
  • Every input is bounded to the range normal practice occupies (Pick Rate 100 to 3000 picks/min, Pick Density 1 to 100 picks/cm and Tapes Woven in Parallel 1 to 100 no., and so on for the rest). Those bounds are guard rails against typing errors, not a claim that the formula fails one unit outside them.
  • The calculation is deterministic: the same inputs always give the same result. It carries no allowance for machine condition, operator skill, ambient conditions or lot-to-lot material variation unless an input above explicitly represents one.
  • Nothing is sent anywhere. The maths runs in your browser, so the numbers you type never leave the page.

On this site

Articles that explain what this tool calculates.

Questions people ask

Does the number of tapes slow the loom?

Not directly; all tapes are woven on the same picks. More tapes do mean more warp ends that can break, which shows up in the efficiency.

Should I use picks per cm or picks per inch?

This tool takes picks per cm. Divide picks per inch by 2.54.

Why is efficiency usually lower on needle looms than on broad looms?

Orders are short and varied, so warp changes and pattern set-ups take a larger share of the time than stops do.

Scroll to Top

Follow on WhatsApp

Scan with your phone’s camera to open the channel, then tap Follow.

QR code for the WhatsApp channelOr open WhatsApp on this device