Home » Calculators » Wet Processing » Wet Processing (Dyeing & Printing) » Screen Printing Colour Paste Consumption Estimator
Jump to a calculator 618 tools

Wet Processing

Screen Printing Colour Paste Consumption Estimator

Put this calculator on your own site

Paste this where you want the calculator to appear. It works on any site — WordPress, Squarespace, Webflow, Ghost or plain HTML — and needs no JavaScript of yours. It carries a link back here, which is the only thing we ask for it.

See what it looks like

Mixed paste that is left over is money thrown away. Estimate before you mix, not after.

Order Fabric to print
m
m
Design & Screen Per colour
35%
1% 100%
g/m²
no.

Total Paste Required

— kg

All colours across the run

Consumption Breakdown

Paste per Colour
— kg
Printed Area
— m2
Paste per Metre of Fabric
— kg/m
Paste per Square Metre
— kg/m2

Coverage is assumed equal across colours here. Where a design has one dominant ground colour, run the estimate separately for each screen.

Using this calculator

About the Screen Printing Colour Paste Consumption Estimator

The formula

This is the expression the tool evaluates. Every term is named underneath, with the unit it must be supplied in.

Total Paste Required
totalPaste = f( fabricLength, width, coverage, pastePickup, colours )

Each input feeds the expression evaluated in the browser; the symbol table below names every term and its unit.

Symbols used above
SymbolStands forUnit
fabricLengthFabric Lengthm
widthFabric Widthm
coverageDesign Coverage per Colour%
pastePickupPaste Pick-up at Full Coverageg/m²
coloursNumber of Coloursno.
totalPasteTotal Paste Requiredkg
pastePerColourPaste per Colourkg
fabricAreaPrinted Aream2
pastePerMetrePaste per Metre of Fabrickg/m
pastePerSqMPaste per Square Metrekg/m2

How the result is derived

Step by step, from the values you type to the figure on screen.

  1. The 5 inputs are read from the form on every keystroke: Fabric Length, Fabric Width, Design Coverage per Colour, Paste Pick-up at Full Coverage and Number of Colours.
  2. Each value is checked against the accepted range in the input table below. A value outside its range stops the calculation rather than producing a misleading figure — the results blank out and a message appears.
  3. The validated values are substituted into the expression above, which resolves Total Paste Required together with every supporting figure in one pass — no value is carried over from a previous entry.
  4. The supporting outputs — Paste per Colour, Printed Area, Paste per Metre of Fabric and Paste per Square Metre — come from the same pass, so they always describe the same case as the headline figure.
  5. Results are rounded for display only. The full-precision value is used throughout the chain, so reading a rounded intermediate figure back into the tool by hand can shift the last digit.

What each input means

Where to read each value on the floor, the unit it must be in, and the range the tool accepts.

InputUnitAccepted rangeDefaultWhat it means
Fabric Lengthm1 to 500000 m1000
Fabric Widthm0.1 to 5 m1.6
Design Coverage per Colour%1 to 100 %35
Paste Pick-up at Full Coverageg/m²10 to 400 g/m²90
Number of Coloursno.1 to 24 no.4

What the tool returns

The headline figure and every supporting value it is built from.

OutputUnitWhat it tells you
Total Paste Required (headline result)kgAll colours across the run
Paste per Colourkg
Printed Aream2
Paste per Metre of Fabrickg/m
Paste per Square Metrekg/m2

Worked example

Given

Fabric Length
1000 m
Fabric Width
1.6 m
Design Coverage per Colour
35 %
Paste Pick-up at Full Coverage
90 g/m²
Number of Colours
4 no.

The tool loads with this case already solved — the Total Paste Required shown above is its answer. Change one value and the difference from this baseline is the sensitivity of the result to that variable.

How to use it

  1. Work through the input groups in order — Order and Design & Screen. The defaults are a realistic case, so you can change one value at a time and watch what moves.
  2. There is no calculate button. Every figure recalculates as you type or drag, which is what makes this usable for a what-if sweep rather than a single answer.
  3. Read Total Paste Required in the dark results panel — that is the headline figure, expressed in kg.
  4. Check the supporting rows underneath (Paste per Colour, Printed Area, Paste per Metre of Fabric and Paste per Square Metre) before acting on the headline — they are where an implausible input usually shows itself first.
  5. Reset to defaults returns every field to the reference case, which is the quickest way to check whether a surprising result came from the tool or from an input you had changed earlier.

Where this is used

  • Process planning — establishing Total Paste Required before a trial is booked, so machine time and material in Wet Processing (Dyeing & Printing) are committed against a calculated figure rather than an estimate.
  • Costing and quotation — Total Paste Required is an input to the cost sheet, and quoting from a worked number rather than a remembered one is what keeps a margin intact.
  • Troubleshooting — when the floor result drifts from plan, entering the measured values (starting with Fabric Length) shows how much of the gap in Total Paste Required each variable explains.
  • Teaching and study — the accepted ranges bracket normal Wet Processing (Dyeing & Printing) practice, so moving one variable at a time shows the shape of the relationship rather than a single answer.

Assumptions and limits

  • Coverage is assumed equal across colours here. Where a design has one dominant ground colour, run the estimate separately for each screen.
  • Every input is bounded to the range normal practice occupies (Fabric Length 1 to 500000 m, Fabric Width 0.1 to 5 m and Design Coverage per Colour 1 to 100 %, and so on for the rest). Those bounds are guard rails against typing errors, not a claim that the formula fails one unit outside them.
  • The calculation is deterministic: the same inputs always give the same result. It carries no allowance for machine condition, operator skill, ambient conditions or lot-to-lot material variation unless an input above explicitly represents one.
  • Nothing is sent anywhere. The maths runs in your browser, so the numbers you type never leave the page.

Questions people ask

What do I need to know before using the Screen Printing Colour Paste Consumption Estimator?

Have these to hand: Fabric Length, Fabric Width, Design Coverage per Colour, Paste Pick-up at Full Coverage and Number of Colours. With those entered, the tool returns Total Paste Required immediately.

What exactly is Total Paste Required?

All colours across the run. It is reported in kg. It is derived from Fabric Length, Fabric Width, Design Coverage per Colour, Paste Pick-up at Full Coverage and Number of Colours, and is the figure the rest of the Wet Processing (Dyeing & Printing) calculation is built around.

Which units does this calculator expect?

Enter Fabric Length in m, Fabric Width in m, Design Coverage per Colour in %, Paste Pick-up at Full Coverage in g/m² and Number of Colours in no.. Mixing unit systems is the most common cause of a result that looks an order of magnitude wrong — convert before typing, not after reading.

What are the other figures under the main result?

They are the intermediate quantities the calculation passes through: Paste per Colour, Printed Area, Paste per Metre of Fabric and Paste per Square Metre. They are shown because a headline number nobody can trace is a number nobody trusts — checking them against your own expectation is the fastest way to confirm the inputs were read as you intended.

Can I rely on this for a production decision?

Coverage is assumed equal across colours here. Where a design has one dominant ground colour, run the estimate separately for each screen. Treat the output as an engineering estimate that narrows the trial window, not as a substitute for the trial.

Scroll to Top