Paste this where you want the calculator to appear. It works on any site — WordPress, Squarespace, Webflow, Ghost or plain HTML — and needs no JavaScript of yours. It carries a link back here, which is the only thing we ask for it.
An addition costs an hour. A strip and redye costs most of a shift and a fabric that never fully recovers.
Monthly Reprocessing Cost
—/month
Additions and strip-redyes together
Failure Economics
Batches Failing
—per month
Cost of One Addition
—/batch
Cost of One Strip & Redye
—/batch
Reprocessing Cost per Batch Dyed
—/batch
Value of One RFT Point
—/month
Machine Hours Consumed
—h/month
Only the direct cost of reprocessing appears here, and it is usually the smaller half. Lost machine capacity in a dyehouse running near full is worth more than the chemicals and steam, because every reprocessed batch displaces a saleable one; the machine hours figure is there to be valued at your own contribution rate rather than at machine cost. Fabric quality loss after stripping, delivery delay and the risk of outright rejection are excluded entirely. The value of an RFT point also assumes the failure mix stays the same as RFT improves, whereas the easy failures usually go first and the residual mix worsens.
Using this calculator
About the Right-First-Time Dyeing Reprocessing Cost Penalty
The formula
This is the expression the tool evaluates. Every term is named underneath, with the unit it must be supplied in.
Each input feeds the expression evaluated in the browser; the symbol table below names every term and its unit.
Symbols used above
Symbol
Stands for
Unit
batchWeight
Batch Weight
kg
batchesPerMonth
Batches per Month
no.
rftRate
Right-First-Time Rate
%
additionShare
Failures Fixed by Addition
%
additionTime
Addition Cycle Time
h
stripRedyeTime
Strip & Redye Time
h
machineCostPerHour
Machine Cost per Hour
/h
steamPerHour
Steam Consumption
kg/h
steamCost
Steam Cost
/kg
additionChemicalCost
Addition Chemicals
/kg fabric
stripChemicalCost
Strip & Redye Chemicals
/kg fabric
monthlyReprocessCost
Monthly Reprocessing Cost
/month
failedBatches
Batches Failing
per month
additionCost
Cost of One Addition
/batch
stripRedyeCost
Cost of One Strip & Redye
/batch
costPerBatch
Reprocessing Cost per Batch Dyed
/batch
valuePerRftPoint
Value of One RFT Point
/month
lostMachineHours
Machine Hours Consumed
h/month
How the result is derived
Step by step, from the values you type to the figure on screen.
The 11 inputs are read from the form on every keystroke: Batch Weight, Batches per Month, Right-First-Time Rate, Failures Fixed by Addition, Addition Cycle Time, Strip & Redye Time, Machine Cost per Hour, Steam Consumption, Steam Cost, Addition Chemicals and Strip & Redye Chemicals.
Each value is checked against the accepted range in the input table below. A value outside its range stops the calculation rather than producing a misleading figure — the results blank out and a message appears.
The validated values are substituted into the expression above, which resolves Monthly Reprocessing Cost together with every supporting figure in one pass — no value is carried over from a previous entry.
The supporting outputs — Batches Failing, Cost of One Addition, Cost of One Strip & Redye, Reprocessing Cost per Batch Dyed, Value of One RFT Point and Machine Hours Consumed — come from the same pass, so they always describe the same case as the headline figure.
Results are rounded for display only. The full-precision value is used throughout the chain, so reading a rounded intermediate figure back into the tool by hand can shift the last digit.
What each input means
Where to read each value on the floor, the unit it must be in, and the range the tool accepts.
Input
Unit
Accepted range
Default
What it means
Batch Weight
kg
10 to 10000 kg
500
Batches per Month
no.
1 to 5000 no.
180
Right-First-Time Rate
%
30 to 100 %
82
Failures Fixed by Addition
%
0 to 100 %
70
Addition Cycle Time
h
0.2 to 12 h
1.8
Strip & Redye Time
h
1 to 30 h
6.5
Machine Cost per Hour
/h
1 to 500 /h
45
Steam Consumption
kg/h
0 to 10000 kg/h
900
Steam Cost
/kg
0 to 2 /kg
0.03
Addition Chemicals
/kg fabric
0 to 20 /kg fabric
0.35
Strip & Redye Chemicals
/kg fabric
0 to 50 /kg fabric
1.6
What the tool returns
The headline figure and every supporting value it is built from.
Output
Unit
What it tells you
Monthly Reprocessing Cost (headline result)
/month
Additions and strip-redyes together
Batches Failing
per month
Cost of One Addition
/batch
Cost of One Strip & Redye
/batch
Reprocessing Cost per Batch Dyed
/batch
Value of One RFT Point
/month
Machine Hours Consumed
h/month
Worked example
Given
Batch Weight
500 kg
Batches per Month
180 no.
Right-First-Time Rate
82 %
Failures Fixed by Addition
70 %
Addition Cycle Time
1.8 h
Strip & Redye Time
6.5 h
Machine Cost per Hour
45 /h
Steam Consumption
900 kg/h
Steam Cost
0.03 /kg
Addition Chemicals
0.35 /kg fabric
Strip & Redye Chemicals
1.6 /kg fabric
The tool loads with this case already solved — the Monthly Reprocessing Cost shown above is its answer. Change one value and the difference from this baseline is the sensitivity of the result to that variable.
How to use it
Work through the input groups in order — Dyehouse and Reprocessing Cost. The defaults are a realistic case, so you can change one value at a time and watch what moves.
There is no calculate button. Every figure recalculates as you type or drag, which is what makes this usable for a what-if sweep rather than a single answer.
Read Monthly Reprocessing Cost in the dark results panel — that is the headline figure, expressed in /month.
Check the supporting rows underneath (Batches Failing, Cost of One Addition, Cost of One Strip & Redye, Reprocessing Cost per Batch Dyed, Value of One RFT Point and Machine Hours Consumed) before acting on the headline — they are where an implausible input usually shows itself first.
Reset to defaults returns every field to the reference case, which is the quickest way to check whether a surprising result came from the tool or from an input you had changed earlier.
Where this is used
Process planning — establishing Monthly Reprocessing Cost before a trial is booked, so machine time and material in Machine Performance & OEE are committed against a calculated figure rather than an estimate.
Costing and quotation — Monthly Reprocessing Cost is an input to the cost sheet, and quoting from a worked number rather than a remembered one is what keeps a margin intact.
Troubleshooting — when the floor result drifts from plan, entering the measured values (starting with Batch Weight) shows how much of the gap in Monthly Reprocessing Cost each variable explains.
Teaching and study — the accepted ranges bracket normal Machine Performance & OEE practice, so moving one variable at a time shows the shape of the relationship rather than a single answer.
Assumptions and limits
Only the direct cost of reprocessing appears here, and it is usually the smaller half. Lost machine capacity in a dyehouse running near full is worth more than the chemicals and steam, because every reprocessed batch displaces a saleable one; the machine hours figure is there to be valued at your own contribution rate rather than at machine cost. Fabric quality loss after stripping, delivery delay and the risk of outright rejection are excluded entirely. The value of an RFT point also assumes the failure mix stays the same as RFT improves, whereas the easy failures usually go first and the residual mix worsens.
Every input is bounded to the range normal practice occupies (Batch Weight 10 to 10000 kg, Batches per Month 1 to 5000 no. and Right-First-Time Rate 30 to 100 %, and so on for the rest). Those bounds are guard rails against typing errors, not a claim that the formula fails one unit outside them.
The calculation is deterministic: the same inputs always give the same result. It carries no allowance for machine condition, operator skill, ambient conditions or lot-to-lot material variation unless an input above explicitly represents one.
Nothing is sent anywhere. The maths runs in your browser, so the numbers you type never leave the page.
Questions people ask
What do I need to know before using the Right-First-Time Dyeing Reprocessing Cost Penalty?
Have these to hand: Batch Weight, Batches per Month, Right-First-Time Rate, Failures Fixed by Addition, Addition Cycle Time, Strip & Redye Time, Machine Cost per Hour, Steam Consumption, Steam Cost, Addition Chemicals and Strip & Redye Chemicals. With those entered, the tool returns Monthly Reprocessing Cost immediately.
What exactly is Monthly Reprocessing Cost?
Additions and strip-redyes together. It is reported in /month. It is derived from Batch Weight, Batches per Month, Right-First-Time Rate, Failures Fixed by Addition, Addition Cycle Time, Strip & Redye Time, Machine Cost per Hour, Steam Consumption, Steam Cost, Addition Chemicals and Strip & Redye Chemicals, and is the figure the rest of the Machine Performance & OEE calculation is built around.
Which units does this calculator expect?
Enter Batch Weight in kg, Batches per Month in no., Right-First-Time Rate in %, Failures Fixed by Addition in %, Addition Cycle Time in h, Strip & Redye Time in h, Machine Cost per Hour in /h, Steam Consumption in kg/h, Steam Cost in /kg, Addition Chemicals in /kg fabric and Strip & Redye Chemicals in /kg fabric. Mixing unit systems is the most common cause of a result that looks an order of magnitude wrong — convert before typing, not after reading.
What are the other figures under the main result?
They are the intermediate quantities the calculation passes through: Batches Failing, Cost of One Addition, Cost of One Strip & Redye, Reprocessing Cost per Batch Dyed, Value of One RFT Point and Machine Hours Consumed. They are shown because a headline number nobody can trace is a number nobody trusts — checking them against your own expectation is the fastest way to confirm the inputs were read as you intended.
Can I rely on this for a production decision?
Only the direct cost of reprocessing appears here, and it is usually the smaller half. Lost machine capacity in a dyehouse running near full is worth more than the chemicals and steam, because every reprocessed batch displaces a saleable one; the machine hours figure is there to be valued at your own contribution rate rather than at machine cost. Fabric quality loss after stripping, delivery delay and the risk of outright rejection are excluded entirely. The value of an RFT point also assumes the failure mix stays the same as RFT improves, whereas the easy failures usually go first and the residual mix worsens. Treat the output as an engineering estimate that narrows the trial window, not as a substitute for the trial.