Textile Engineering
Geosynthetics & Civil Engineering
16 interactive Geosynthetics & Civil Engineering tools. Every one shows its formula, a worked example and the standards it follows.
Professional tools
Full costing sheets, booking schedules and project appraisals. Enter your own figures and see the headline result before you buy.
- Air, Sea or Split: Late Shipment Expedite Sheet Worth of Choosing Style by Style
- Brownfield Expansion: What the Next Increment Costs Shared Plant the Proposal Forces
- Built Into the Fibre or Applied to the Cloth: What Protection Costs Over a Life What Moving to the Cheapest Protection Saves
- Buyer Chargeback: Contest, Fix or Accept Recoverable a Year
- Buyer Cost to Serve & Development Recovery Net Margin After Serving the Book
- Buyer Quotation Generator Order Value
- Buyer Terms & Effective Price Comparison Best Offer, Once Its Terms Are Paid For
- Buyer Test Plan & Laboratory Budget Laboratory Cost for the Range
16
tools
Technical & Performance Textiles
Geosynthetics & Civil Engineering
Expand
Collapse
Geosynthetics & Civil Engineering 16
- Erosion Control Blanket on a Slope: True Slope Length, Strips, Rolls & StaplesLays rolled erosion control blanket (coir, straw, jute or synthetic mat) down a slope from its vertical rise and gradient: the true slope length, the strips across the slope at the side lap, the joins down it, the rolls to order counted by length and by whole cuts, the blanket area against the slope area, and the staples or pins the pattern density calls for.Rolls to Order rolls
- Erosion Wattles & Fibre Rolls on a Slope: Rows, Units, Stakes & Total LengthCounts straw, coir or wood-fibre wattles laid across a slope on the contour: the rows down the slope at the spacing on the plan, the units in each row with the overlap where they meet, the total length of wattle, and the stakes at the spacing used along each unit.Wattles to Order units
- French Drain Geotextile Wrap: Strip Width, Rolls, Fabric Area & Drainage StoneTakes off the filter geotextile for a wrapped trench drain: the strip width to line both walls and the floor and lap over the top of the stone, how many strips one roll width gives when slit, the joins along the run, the rolls to order, the fabric area laid, and the drainage stone round the pipe by volume and mass.Rolls to Order rolls
- Geocell Infill Quantity, Tonnage & Panel CountWorks out how much infill a geocell layer takes: the compacted volume in the cells and the cover above them, the loose volume to order once bulking is allowed for, the tonnage and the truck loads, and how many expanded panels cover the area.Loose Infill to Order m³
- Geogrid Pullout Resistance & Soil Friction CoefficientCalculates geogrid anchorage in a reinforced soil wall: pullout resistance from embedment length and overburden, the mobilised interface friction coefficient, factor of safety against the design tension and the embedment a target safety factor would need.Pullout Resistance kN/m
- Geogrid Reinforced Soil Wall: Layers, Grid Pieces, Rolls, Area & Reinforced FillTakes off the geogrid for a reinforced soil wall or slope from its design: the layers at the vertical spacing, each piece cut to the design length plus any wrap at the face, the pieces in each layer across the wall at the roll width and coverage, how many whole pieces a roll gives and so the rolls to order, the grid laid against the grid bought, and the volume of the reinforced fill zone.Rolls to Order rolls
- Geomembrane Puncture Resistance under Hydrostatic LoadChecks a geomembrane liner against subgrade protrusions: hydrostatic pressure at depth, the point force each stone collects, the cushion geotextile protection factor, factor of safety on puncture resistance and the cushion mass a target safety factor demands.Factor of Safety ×
- Geosynthetic Clay Liner Hydration Swell Index & ThicknessPredicts GCL behaviour on hydration: free swell thickness from bentonite mass and swell index, the confinement factor under overburden, the thickness actually reached, restrained swell pressure and hydrated moisture content.Hydrated Thickness mm
- Geotextile Dewatering Bag: Dry Solids, Cake Volume, Water Released & Bags NeededBalances the masses for dewatering slurry, sludge or dredged sediment in geotextile bags and tubes: the slurry density from its solids content, the dry solids pumped, what the fabric keeps, the wet cake left inside at the cake solids your bench test reached, the cake volume, the water that drains out, and how many bags the final cake fills.Bags or Tubes for the Final Cake bags
- Geotextile Roll Count, Overlap & Wastage for an AreaLays geotextile rolls over a rectangular area and counts what to order: strips across the width at the specified side overlap, joins along the run at the end overlap, linear metres and rolls with a wastage allowance, the trim left on the far edge, and how much fabric the laps and edge allowance add above the net area.Rolls to Order rolls
- Lagoon & Pond Geometry: Floating Cover Area, Liner Area, Volume & Anchor Trench LengthWorks out the sheet a rectangular lagoon or pond with sloped sides takes: the top dimensions from the base, depth and side slope, the water surface, the floating cover with its run-out into the anchor trench and slack, the liner over the base and four sloped sides, the anchor trench length round the top, and the volume held.Floating Cover Area m²
- Sandbag Flood Wall: Layers, Bags per Layer, Sand Tonnage & Woven Sacks to OrderCounts a tapering sandbag wall built from woven polypropylene sacks: the layers from the height and the laid thickness of a filled bag, the bags in each layer as the wall narrows from its base to a single bag on top, the total bags, the sand by mass and volume, and the empty sacks to order with a spare share.Empty Sacks to Order sacks
- Silt Fence Take-Off: Fabric, Rolls, Posts & Trench for a SiteCounts what a run of geotextile silt fence takes: the cut height of fabric from the height above ground and the toe buried in the trench, the joins and laps along the run, the rolls to order with a cutting allowance, the posts at the specified spacing, the trench to dig and backfill, and whether the roll width covers the cut height.Rolls to Order rolls
- Turbidity Curtain (Silt Curtain) Take-Off: Sections, Skirt Depth, Fabric & AnchorsCounts a floating turbidity curtain for work in or beside water: the curtain length with slack for current and tide, the standard sections and connectors to order, the skirt depth the deepest water needs against the skirt the sections carry, the fabric area bought, and the anchors at the spacing on the plan.Sections to Order sections
- Turf Reinforcement Matrix Shear Stress & Channel Velocity LimitsChecks a turf reinforcement mat against channel flow: applied boundary shear stress from depth and slope, Manning velocity, factor of safety on the permissible shear, the maximum flow depth the mat can hold and the discharge that goes with it.Applied Boundary Shear Pa
- Woven Geotextile Sieve Size vs Soil Particle RetentionDerives the largest permissible geotextile opening size from a soil grading curve: uniformity and curvature coefficients, the gradation-dependent retention criterion, the maximum O95 allowed, and clogging and retention ratios for a candidate fabric.Maximum Permissible O95 mm
No calculator matches that search. Try a fibre, a machine, a unit or a standard.