Fibre-to-Garment Cost Cascade with Compounding Stage Losses
Put this calculator on your own site
Paste this where you want the calculator to appear. It works on any site — WordPress, Squarespace, Webflow, Ghost or plain HTML — and needs no JavaScript of yours. It carries a link back here, which is the only thing we ask for it.
Four respectable yields multiply to 65%. A 320 g garment draws 489 g of fibre, and you pay to process all of it.
Ex-Factory Cost per Garment
—per garment
Fibre plus every conversion, with the losses compounded
What the Cascade Costs
Fibre Drawn per Garment
—kg
Waste Multiplier
—x
Cumulative Yield
—%
Fibre in the Garment
—per garment
Conversion & Making
—per garment
Fibre Share of Cost
—%
Cost of the Losses Alone
—per garment
Cost Move per +10% Fibre
—%
Conversion costs here are charged on the mass ENTERING each stage, not the mass leaving it, which is the point of the tool: a factory pays to blow, card, knit and dye material that it later drops as noil, hard waste or an off-shade roll. Quotations that charge conversion on good output instead will read lower, and will keep reading lower right up until the year-end stock count. The cumulative yield is a product, not an average — the single most common costing error in the industry is to take four yields in the high eighties and reason as though the chain runs at about eighty-eight percent, when it runs at sixty-five. The sensitivity figure answers the merchandiser question directly: because fibre is only part of the cost, a ten percent fibre move does not move the quotation by ten percent, and knowing which fraction it does move is the difference between holding a price and losing a margin. Cut-and-make is per garment because that is how it is quoted and how it behaves; everything upstream is per kilogram because that is how it is bought.
Using this calculator
About the Fibre-to-Garment Cost Cascade with Compounding Stage Losses
The formula
This is the expression the tool evaluates. Every term is named underneath, with the unit it must be supplied in.
The chain yieldcumulativeYield = spinningYield x fabricYield x dyeingYield x cuttingYield
Yields multiply rather than average, and that is the whole reason the fibre figure surprises people. 88%, 95%, 92% and 85% come to 65.4% — not to the high eighties the four individual numbers suggest.
Walking back up the chainmassPanels = garmentWeight / cuttingYield massGreige = massPanels / dyeingYield
You know the garment and want the fibre, so each stage divides by its yield instead of multiplying by it. massPanels is the dyed fabric the cutting room must issue to leave the garment's own weight behind in panels.
A 320 g garment at those four yields draws 489 g of fibre. The factory buys, freights, finances and pays to process every gram of the difference.
Ex-factory cost per garmentcostPerGarment = massFibre x (fibrePrice + spinningCost) + massYarn x fabricCost + massGreige x dyeingCost + cmCost
Each conversion is charged on the mass ENTERING its stage: spinning handles the fibre, fabric formation the yarn, dyeing the greige. Charging on good output instead hides exactly the waste this tool exists to show.
What a fibre move does to the quotationfibreSensitivity = 0.10 x fibreCost / costPerGarment
Fibre is only part of the cost, so a ten percent fibre move does not move the price by ten percent. This is the fraction it does move, and it is the difference between holding a price and losing a margin.
Symbols used above
Symbol
Stands for
Unit
fibrePrice
Fibre Price
per kg
spinningYield
Spinning Yield
%
spinningCost
Spinning Conversion
per kg in
fabricYield
Fabric Formation Yield
%
fabricCost
Knitting or Weaving Conversion
per kg in
dyeingYield
Dyeing & Finishing Yield
%
dyeingCost
Dyeing & Finishing Conversion
per kg in
garmentWeight
Finished Garment Fabric Weight
kg
cuttingYield
Cutting Yield
%
cmCost
Cut & Make
per garment
costPerGarment
Ex-Factory Cost per Garment
per garment
fibrePerGarment
Fibre Drawn per Garment
kg
wasteMultiplier
Waste Multiplier
x
cumulativeYield
Cumulative Yield
%
fibreCost
Fibre in the Garment
per garment
conversionCost
Conversion & Making
per garment
fibreShare
Fibre Share of Cost
%
lossCost
Cost of the Losses Alone
per garment
fibreSensitivity
Cost Move per +10% Fibre
%
How the result is derived
Step by step, from the values you type to the figure on screen.
The 10 inputs are read from the form on every keystroke: Fibre Price, Spinning Yield, Spinning Conversion, Fabric Formation Yield, Knitting or Weaving Conversion, Dyeing & Finishing Yield, Dyeing & Finishing Conversion, Finished Garment Fabric Weight, Cutting Yield and Cut & Make.
Each value is checked against the accepted range in the input table below. A value outside its range stops the calculation rather than producing a misleading figure — the results blank out and a message appears.
The validated values are substituted into the expression above, which resolves Ex-Factory Cost per Garment together with every supporting figure in one pass — no value is carried over from a previous entry.
The supporting outputs — Fibre Drawn per Garment, Waste Multiplier, Cumulative Yield, Fibre in the Garment, Conversion & Making, Fibre Share of Cost, Cost of the Losses Alone and Cost Move per +10% Fibre — come from the same pass, so they always describe the same case as the headline figure.
Results are rounded for display only. The full-precision value is used throughout the chain, so reading a rounded intermediate figure back into the tool by hand can shift the last digit.
What each input means
Where to read each value on the floor, the unit it must be in, and the range the tool accepts.
Input
Unit
Accepted range
Default
What it means
Fibre Price
per kg
0.05 to 200 per kg
2.2
Landed cost of the fibre or its blend, in whatever currency you quote in. Every result follows that currency.
Spinning Yield
%
40 to 100 %
88
Fibre to yarn. Blowroom droppings, card and comber noil, winding waste. Combed counts sit well below carded here.
Spinning Conversion
per kg in
0 to 50 per kg in
1.15
Charged on the mass entering the stage, so material that later becomes noil is still paid to process.
Fabric Formation Yield
%
50 to 100 %
95
Yarn to greige. Knitting waste, weaving hard waste, loom and machine seconds.
Knitting or Weaving Conversion
per kg in
0 to 50 per kg in
0.85
Dyeing & Finishing Yield
%
40 to 100 %
92
Greige to saleable finished fabric, after shade rejection, reprocessing losses and off-shade rolls held back.
Dyeing & Finishing Conversion
per kg in
0 to 50 per kg in
1.4
Finished Garment Fabric Weight
kg
0.01 to 10 kg
0.32
The fabric in the garment as it ships — not the fabric issued to the cutting room.
Cutting Yield
%
50 to 100 %
85
Fabric to panels: marker efficiency, end-of-ply and end-of-roll loss, splice allowance. This is the stage most quotations flatter.
Cut & Make
per garment
0 to 200 per garment
1.8
Sewing, finishing and packing, per garment rather than per kilogram.
What the tool returns
The headline figure and every supporting value it is built from.
Output
Unit
What it tells you
Ex-Factory Cost per Garment (headline result)
per garment
Fibre plus every conversion, with the losses compounded
Fibre Drawn per Garment
kg
Waste Multiplier
x
Cumulative Yield
%
Fibre in the Garment
per garment
Conversion & Making
per garment
Fibre Share of Cost
%
Cost of the Losses Alone
per garment
Cost Move per +10% Fibre
%
Worked example
Given
Fibre Price
2.2 per kg
Spinning Yield
88 %
Spinning Conversion
1.15 per kg in
Fabric Formation Yield
95 %
Knitting or Weaving Conversion
0.85 per kg in
Dyeing & Finishing Yield
92 %
Dyeing & Finishing Conversion
1.4 per kg in
Finished Garment Fabric Weight
0.32 kg
Cutting Yield
85 %
Cut & Make
1.8 per garment
The tool loads with this case already solved — the Ex-Factory Cost per Garment shown above is its answer. Change one value and the difference from this baseline is the sensitivity of the result to that variable.
How to use it
Work through the input groups in order — Fibre, Fabric and Garment. The defaults are a realistic case, so you can change one value at a time and watch what moves.
There is no calculate button. Every figure recalculates as you type or drag, which is what makes this usable for a what-if sweep rather than a single answer.
Read Ex-Factory Cost per Garment in the dark results panel — that is the headline figure, expressed in per garment.
Check the supporting rows underneath (Fibre Drawn per Garment, Waste Multiplier, Cumulative Yield, Fibre in the Garment, Conversion & Making, Fibre Share of Cost, Cost of the Losses Alone and Cost Move per +10% Fibre) before acting on the headline — they are where an implausible input usually shows itself first.
Reset to defaults returns every field to the reference case, which is the quickest way to check whether a surprising result came from the tool or from an input you had changed earlier.
Where this is used
Process planning — establishing Ex-Factory Cost per Garment before a trial is booked, so machine time and material in Commercial Costing & Advanced Textiles are committed against a calculated figure rather than an estimate.
Costing and quotation — Ex-Factory Cost per Garment is an input to the cost sheet, and quoting from a worked number rather than a remembered one is what keeps a margin intact.
Troubleshooting — when the floor result drifts from plan, entering the measured values (starting with Fibre Price) shows how much of the gap in Ex-Factory Cost per Garment each variable explains.
Teaching and study — the accepted ranges bracket normal Commercial Costing & Advanced Textiles practice, so moving one variable at a time shows the shape of the relationship rather than a single answer.
Assumptions and limits
Conversion costs here are charged on the mass ENTERING each stage, not the mass leaving it, which is the point of the tool: a factory pays to blow, card, knit and dye material that it later drops as noil, hard waste or an off-shade roll. Quotations that charge conversion on good output instead will read lower, and will keep reading lower right up until the year-end stock count. The cumulative yield is a product, not an average — the single most common costing error in the industry is to take four yields in the high eighties and reason as though the chain runs at about eighty-eight percent, when it runs at sixty-five. The sensitivity figure answers the merchandiser question directly: because fibre is only part of the cost, a ten percent fibre move does not move the quotation by ten percent, and knowing which fraction it does move is the difference between holding a price and losing a margin. Cut-and-make is per garment because that is how it is quoted and how it behaves; everything upstream is per kilogram because that is how it is bought.
Every input is bounded to the range normal practice occupies (Fibre Price 0.05 to 200 per kg, Spinning Yield 40 to 100 % and Spinning Conversion 0 to 50 per kg in, and so on for the rest). Those bounds are guard rails against typing errors, not a claim that the formula fails one unit outside them.
The calculation is deterministic: the same inputs always give the same result. It carries no allowance for machine condition, operator skill, ambient conditions or lot-to-lot material variation unless an input above explicitly represents one.
Nothing is sent anywhere. The maths runs in your browser, so the numbers you type never leave the page.
Questions people ask
What do I need to know before using the Fibre-to-Garment Cost Cascade with Compounding Stage Losses?
Have these to hand: Fibre Price, Spinning Yield, Spinning Conversion, Fabric Formation Yield, Knitting or Weaving Conversion, Dyeing & Finishing Yield, Dyeing & Finishing Conversion, Finished Garment Fabric Weight, Cutting Yield and Cut & Make. With those entered, the tool returns Ex-Factory Cost per Garment immediately.
What exactly is Ex-Factory Cost per Garment?
Fibre plus every conversion, with the losses compounded. It is reported in per garment. It is derived from Fibre Price, Spinning Yield, Spinning Conversion, Fabric Formation Yield, Knitting or Weaving Conversion, Dyeing & Finishing Yield, Dyeing & Finishing Conversion, Finished Garment Fabric Weight, Cutting Yield and Cut & Make, and is the figure the rest of the Commercial Costing & Advanced Textiles calculation is built around.
Which units does this calculator expect?
Enter Fibre Price in per kg, Spinning Yield in %, Spinning Conversion in per kg in, Fabric Formation Yield in %, Knitting or Weaving Conversion in per kg in, Dyeing & Finishing Yield in %, Dyeing & Finishing Conversion in per kg in, Finished Garment Fabric Weight in kg, Cutting Yield in % and Cut & Make in per garment. Mixing unit systems is the most common cause of a result that looks an order of magnitude wrong — convert before typing, not after reading.
What are the other figures under the main result?
They are the intermediate quantities the calculation passes through: Fibre Drawn per Garment, Waste Multiplier, Cumulative Yield, Fibre in the Garment, Conversion & Making, Fibre Share of Cost, Cost of the Losses Alone and Cost Move per +10% Fibre. They are shown because a headline number nobody can trace is a number nobody trusts — checking them against your own expectation is the fastest way to confirm the inputs were read as you intended.
Can I rely on this for a production decision?
Conversion costs here are charged on the mass ENTERING each stage, not the mass leaving it, which is the point of the tool: a factory pays to blow, card, knit and dye material that it later drops as noil, hard waste or an off-shade roll. Quotations that charge conversion on good output instead will read lower, and will keep reading lower right up until the year-end stock count. The cumulative yield is a product, not an average — the single most common costing error in the industry is to take four yields in the high eighties and reason as though the chain runs at about eighty-eight percent, when it runs at sixty-five. The sensitivity figure answers the merchandiser question directly: because fibre is only part of the cost, a ten percent fibre move does not move the quotation by ten percent, and knowing which fraction it does move is the difference between holding a price and losing a margin. Cut-and-make is per garment because that is how it is quoted and how it behaves; everything upstream is per kilogram because that is how it is bought. Treat the output as an engineering estimate that narrows the trial window, not as a substitute for the trial.