Jump to a calculator 671 tools
Woven Carpet
Axminster & Wilton Wire Height to Pile Yarn Consumption
On a five-frame Wilton, four fifths of the pile yarn you buy is buried in the body of the carpet and never seen.
Pile Yarn per Square Metre
— g/m²
All pile yarn consumed, surface and buried together
Pile Build-up
- Surface Tuft Density
- — tufts/m²
- Yarn per Surface Tuft
- — mm
- Surface Pile Weight
- — g/m²
- Buried Pile Weight
- — g/m²
- Wire Height for Target
- — mm
Frames are assumed to share the surface evenly, which a real design never does — a pattern with a dominant ground colour buries less of that frame and more of the others, so consumption by colour must come from the pattern data rather than from an even split. Planted or semi-worsted Axminster does not carry buried frames at all and the buried figure should be read as zero there. Sculptured effects use several wire heights in one carpet; run the tool once per wire and weight the results by their area share.
Using this calculator
About the Axminster & Wilton Wire Height to Pile Yarn Consumption
The formula
This is the expression the tool evaluates. Every term is named underneath, with the unit it must be supplied in.
pileYarnPerSquareMetre = f( wireHeight, wireThickness, targetPileHeight, heightLoss, rowsPerMetre, pileEndsPerMetre, frames, pileYarnCount, groundTakeUp )Each input feeds the expression evaluated in the browser; the symbol table below names every term and its unit.
| Symbol | Stands for | Unit |
|---|---|---|
wireHeight | Wire Height | mm |
wireThickness | Wire Thickness | mm |
targetPileHeight | Target Finished Pile Height | mm |
heightLoss | Height Lost in Finishing | % |
rowsPerMetre | Pile Rows per Metre | rows/m |
pileEndsPerMetre | Pile Ends per Metre (all frames) | ends/m |
frames | Colour Frames | no. |
pileYarnCount | Pile Yarn Count | tex |
groundTakeUp | Ground Interlacing Take-up | % |
pileYarnPerSquareMetre | Pile Yarn per Square Metre | g/m² |
tuftsPerSquareMetre | Surface Tuft Density | tufts/m² |
yarnPerTuft | Yarn per Surface Tuft | mm |
surfacePileWeight | Surface Pile Weight | g/m² |
buriedPileWeight | Buried Pile Weight | g/m² |
requiredWireHeight | Wire Height for Target | mm |
How the result is derived
Step by step, from the values you type to the figure on screen.
- The 9 inputs are read from the form on every keystroke: Wire Height, Wire Thickness, Target Finished Pile Height, Height Lost in Finishing, Pile Rows per Metre, Pile Ends per Metre (all frames), Colour Frames, Pile Yarn Count and Ground Interlacing Take-up.
- Each value is checked against the accepted range in the input table below. A value outside its range stops the calculation rather than producing a misleading figure — the results blank out and a message appears.
- The validated values are substituted into the expression above, which resolves Pile Yarn per Square Metre together with every supporting figure in one pass — no value is carried over from a previous entry.
- The supporting outputs — Surface Tuft Density, Yarn per Surface Tuft, Surface Pile Weight, Buried Pile Weight and Wire Height for Target — come from the same pass, so they always describe the same case as the headline figure.
- Results are rounded for display only. The full-precision value is used throughout the chain, so reading a rounded intermediate figure back into the tool by hand can shift the last digit.
What each input means
Where to read each value on the floor, the unit it must be in, and the range the tool accepts.
| Input | Unit | Accepted range | Default | What it means |
|---|---|---|---|---|
| Wire Height | mm | 2 to 25 mm | 8 | |
| Wire Thickness | mm | 0.5 to 5 mm | 1.6 | |
| Target Finished Pile Height | mm | 2 to 25 mm | 7 | |
| Height Lost in Finishing | % | 0 to 30 % | 5 | |
| Pile Rows per Metre | rows/m | 50 to 900 rows/m | 315 | |
| Pile Ends per Metre (all frames) | ends/m | 100 to 5000 ends/m | 1575 | |
| Colour Frames | no. | 1 to 8 no. | 5 | |
| Pile Yarn Count | tex | 50 to 2000 tex | 300 | |
| Ground Interlacing Take-up | % | 0 to 30 % | 6 |
What the tool returns
The headline figure and every supporting value it is built from.
| Output | Unit | What it tells you |
|---|---|---|
| Pile Yarn per Square Metre (headline result) | g/m² | All pile yarn consumed, surface and buried together |
| Surface Tuft Density | tufts/m² | |
| Yarn per Surface Tuft | mm | |
| Surface Pile Weight | g/m² | |
| Buried Pile Weight | g/m² | |
| Wire Height for Target | mm |
Worked example
Given
- Wire Height
- 8 mm
- Wire Thickness
- 1.6 mm
- Target Finished Pile Height
- 7 mm
- Height Lost in Finishing
- 5 %
- Pile Rows per Metre
- 315 rows/m
- Pile Ends per Metre (all frames)
- 1575 ends/m
- Colour Frames
- 5 no.
- Pile Yarn Count
- 300 tex
- Ground Interlacing Take-up
- 6 %
The tool loads with this case already solved — the Pile Yarn per Square Metre shown above is its answer. Change one value and the difference from this baseline is the sensitivity of the result to that variable.
How to use it
- Work through the input groups in order — Wire & Pile Height and Loom & Yarn. The defaults are a realistic case, so you can change one value at a time and watch what moves.
- There is no calculate button. Every figure recalculates as you type or drag, which is what makes this usable for a what-if sweep rather than a single answer.
- Read Pile Yarn per Square Metre in the dark results panel — that is the headline figure, expressed in g/m².
- Check the supporting rows underneath (Surface Tuft Density, Yarn per Surface Tuft, Surface Pile Weight, Buried Pile Weight and Wire Height for Target) before acting on the headline — they are where an implausible input usually shows itself first.
- Reset to defaults returns every field to the reference case, which is the quickest way to check whether a surprising result came from the tool or from an input you had changed earlier.
Where this is used
- Process planning — establishing Pile Yarn per Square Metre before a trial is booked, so machine time and material in Carpet & Floor Coverings are committed against a calculated figure rather than an estimate.
- Costing and quotation — Pile Yarn per Square Metre is an input to the cost sheet, and quoting from a worked number rather than a remembered one is what keeps a margin intact.
- Troubleshooting — when the floor result drifts from plan, entering the measured values (starting with Wire Height) shows how much of the gap in Pile Yarn per Square Metre each variable explains.
- Teaching and study — the accepted ranges bracket normal Carpet & Floor Coverings practice, so moving one variable at a time shows the shape of the relationship rather than a single answer.
Assumptions and limits
- Frames are assumed to share the surface evenly, which a real design never does — a pattern with a dominant ground colour buries less of that frame and more of the others, so consumption by colour must come from the pattern data rather than from an even split. Planted or semi-worsted Axminster does not carry buried frames at all and the buried figure should be read as zero there. Sculptured effects use several wire heights in one carpet; run the tool once per wire and weight the results by their area share.
- Every input is bounded to the range normal practice occupies (Wire Height 2 to 25 mm, Wire Thickness 0.5 to 5 mm and Target Finished Pile Height 2 to 25 mm, and so on for the rest). Those bounds are guard rails against typing errors, not a claim that the formula fails one unit outside them.
- The calculation is deterministic: the same inputs always give the same result. It carries no allowance for machine condition, operator skill, ambient conditions or lot-to-lot material variation unless an input above explicitly represents one.
- Nothing is sent anywhere. The maths runs in your browser, so the numbers you type never leave the page.
Questions people ask
What do I need to know before using the Axminster & Wilton Wire Height to Pile Yarn Consumption?
Have these to hand: Wire Height, Wire Thickness, Target Finished Pile Height, Height Lost in Finishing, Pile Rows per Metre, Pile Ends per Metre (all frames), Colour Frames, Pile Yarn Count and Ground Interlacing Take-up. With those entered, the tool returns Pile Yarn per Square Metre immediately.
What exactly is Pile Yarn per Square Metre?
All pile yarn consumed, surface and buried together. It is reported in g/m². It is derived from Wire Height, Wire Thickness, Target Finished Pile Height, Height Lost in Finishing, Pile Rows per Metre, Pile Ends per Metre (all frames), Colour Frames, Pile Yarn Count and Ground Interlacing Take-up, and is the figure the rest of the Carpet & Floor Coverings calculation is built around.
Which units does this calculator expect?
Enter Wire Height in mm, Wire Thickness in mm, Target Finished Pile Height in mm, Height Lost in Finishing in %, Pile Rows per Metre in rows/m, Pile Ends per Metre (all frames) in ends/m, Colour Frames in no., Pile Yarn Count in tex and Ground Interlacing Take-up in %. Mixing unit systems is the most common cause of a result that looks an order of magnitude wrong — convert before typing, not after reading.
What are the other figures under the main result?
They are the intermediate quantities the calculation passes through: Surface Tuft Density, Yarn per Surface Tuft, Surface Pile Weight, Buried Pile Weight and Wire Height for Target. They are shown because a headline number nobody can trace is a number nobody trusts — checking them against your own expectation is the fastest way to confirm the inputs were read as you intended.
Can I rely on this for a production decision?
Frames are assumed to share the surface evenly, which a real design never does — a pattern with a dominant ground colour buries less of that frame and more of the others, so consumption by colour must come from the pattern data rather than from an even split. Planted or semi-worsted Axminster does not carry buried frames at all and the buried figure should be read as zero there. Sculptured effects use several wire heights in one carpet; run the tool once per wire and weight the results by their area share. Treat the output as an engineering estimate that narrows the trial window, not as a substitute for the trial.